To animate the Banner
Procurement Tender
Tender Projects for Chemical Pharmaceuticals (Sodium Hypochlorite, Sodium Hydroxide, and Hydrochloric Acid) in June and July 2021
2021年10月28日 08:00
Name
Last updated:
Size
-
2023-11-17 11:26:55.486
18.5KB
1. Procurement Technical Requirements (Emphasize, in bold italics, the substantive requirements and conditions that do not permit deviation.)
2. The scope of this procurement includes the supply, transportation, installation, maintenance, personnel training, and after-sales service of the goods.
3. Procurement budget amount for this project : RMB 790,000.00 (¥790,000.00). Any response quotation that exceeds the procurement budget or the maximum price limit shall be deemed an invalid response. The maximum price limit for this project is set at 90% of the procurement budget. Unless otherwise specified, all procured goods shall be supplied in accordance with standard functions and technical specifications. The products supplied must be brand-new, qualified, and genuine, and the manufacturer must provide a product warranty certificate. For imported products, relevant certification documents must be provided, and such products must also comply with national environmental protection standards and other applicable quality standards.
4. Quality Requirements for Goods
Complies with the requirements of the Hygienic Standard for Drinking Water (GB 5750–2006). Consumable reagents for online instruments shall be compatible with the corresponding equipment, and standard reference materials and consumable reagents for online instruments shall be supplied on an as-needed basis, ensuring that their shelf life is not exceeded. All chemicals and standard reference materials must meet the requirements of Jiangsu Province’s “Dual Random” inspection and the assessment and evaluation indicator system for urban water supply safety assurance in Jiangsu Province. All standard reference materials and environmental standard reference materials listed in Tables 1–3 and 1–4 shall comply with the standards specified in the notes.
The manufacturer of the provided standard solutions shall hold a National Standard Reference Material Certification and an Accreditation Certificate for the Production of Standard Substances/Standard Samples. The transportation of chemical reagents and consumables must comply with relevant national laws and regulations as well as industry standards.
5. After-Sales Service Requirements
(1) The equipment shall be covered by a one-year free warranty period commencing on the date of acceptance. During the warranty period, Party B shall provide the “three guarantees” for product quality: for any failures caused by defects in equipment configuration or manufacturing, Party B shall promptly provide free repair or replacement within 24 hours, and shall bear all associated costs.
(2) Technical support response times: For routine issues, telephone support shall be provided within 2 hours; for complex or critical issues, on-site resolution shall be achieved within 2 days. During the warranty period, all related costs shall be borne by Party B; upon expiration of the warranty period, Party B shall charge only the actual cost.
In addition to the service requirements stipulated in this document, the Supplier shall provide a detailed description of any after-sales services it undertakes, and shall be responsible for providing, at no charge, equipment repair services and training for operating personnel to the Purchaser. The response time for repair requests shall be the normal travel time plus three hours.
6. Delivery Time and Place
(1) To facilitate the purchaser’s production planning, the delivery dates for all goods shall be determined through mutual consultation; where necessary, deliveries shall be made in installments. The supplier must commit to reasonable delivery schedules and ensure that each installment is delivered within two days of mutual confirmation of the corresponding order. Any delay in delivery shall be subject to appropriate financial penalties.
(2) Delivery Location: The Supplier shall deliver the goods and unload them at the location designated by the Purchaser, accompanied by all relevant documentation (e.g., certificates of conformity, test reports). The Purchaser shall organize relevant personnel to conduct inspection of the goods; any goods that fail inspection shall be returned without exception, and all resulting losses shall be borne by the Supplier.
7. Payment Method
Upon initial on-site inspection and acceptance of each shipment, full payment shall be made in a lump sum after 10 days of use without any quality issues being detected.
Official Account
Quick Navigation
Service Hotline:0772-3269371
Sales Hotline:0772-3269368
Business Inquiry:18507729998(Manager Zhang)
Address: No. 12, Leye Road, Xinxing Industrial Park, Liujiang District, Liuzhou City
Copyright © 2026 SINOTRUK Liuzhou Yunli Special Vehicle Co., LTD.