Tender for the Installation of Explosion-Proof Lighting in the Second-Phase Paint-Repair Booth at Liuzhou Transportation Capacity
Release Date:
2025-08-20
Chapter One Invitation to Tender
X X Company:
Our company is conducting an open tender for the installation of explosion-proof lighting in the paint-repair workshop of Phase II of the Liuzhou Transportation Capacity Project. The tendering conditions are now met, and qualified potential bidders are invited to submit bids.
1 1. Tender Number: YL3-2025-0819
2 1. Project Name: Installation of Explosion-Proof Lighting in the Second Phase Paint Repair Booth at Liuzhou Transportation Capacity Project
3 1. Project Scope: Installation of Explosion-Proof Lighting in the Touch-Up Paint Booth for Phase II of the Liuzhou Transportation Capacity Project
4 Bidders participating in the tender must carefully read the Instructions to Bidders and all other contents of the Tender Documents to avoid any errors.
5 , Submission of Bidding Documents
5.1 Submission Deadline: Bidding documents must be submitted and the corresponding bid bond of RMB 5,000 paid no later than 12:00 noon on August 27, 2025. The bid bond shall be transferred from the bidder’s basic account to the following account, with the remark “Bid Bond for [Project Name]” clearly indicated on the remittance slip. Submissions received after the deadline will not be accepted. The bid bonds of unsuccessful bidders will be returned on Announcement of Tender Results The bid bond shall be refunded within 30 days, and the successful bidder’s bid bond shall be converted into a performance bond.
5.2 Submission Location: Room 305, Party and Mass Work Department, Office Building of China National Heavy Duty Truck Group Liuzhou Yunli Special-Purpose Vehicle Co., Ltd.
Account Name: China National Heavy Duty Truck Group Liuzhou Yunli Special-Purpose Vehicle Co., Ltd.
Account-opening Bank: Liujiang Xinxing Sub-branch of Agricultural Bank of China Co., Ltd.
Bank account: 2013 2401 0400 0157 1
6 1. Bid Opening Time and Venue: The bid opening is tentatively scheduled for 2:00 p.m. on August 28, 2025, in the Conference Room of the Phase I Manufacturing Department of China National Heavy Duty Truck Group Liuzhou Yunli Special-Purpose Vehicle Co., Ltd., and will be conducted as an internal company bidding evaluation.
7 1. Contact and inquiry telephone numbers and mailing address:
Unit: China National Heavy Duty Truck Group Liuzhou Yunli Special-Purpose Vehicle Co., Ltd.
Address: No. 12, Leye Road, Xinxing Industrial Park, Liujiang District, Liuzhou City
Postal Code: 545112
Telephone: 0772-3269380
Email: 932071248@qq.com
Contact: Pan Juncheng, Phone: 15507720995
Chapter 2 Instructions to Bidders
1 1. Preliminary Schedule of Instructions to Bidders
|
Project |
Content |
Instructions and Requirements |
|
1 |
Project Name |
Installation of Explosion-Proof Lighting in the Second Phase Paint Repair Booth at Liuzhou Transportation Capacity Project |
|
2 |
Tender Content |
See Chapter 8, Annex II for details. |
|
3 |
Quality Standards |
Acceptance shall be conducted by the tendering party in accordance with national or industry standards. |
|
4 |
Qualification Requirements |
See the Bidding Instructions for details. 2.2 |
|
5 |
Qualification Review |
See the Bidding Instructions for details. 2.2 |
|
6 |
Quotation method (tax-inclusive price) |
Submit a quotation based on the tender requirements. |
|
7 |
Tender Validity Period |
Before the deadline for submission of tender documents |
|
8 |
Guarantee |
Upon winning the bid, the bid bond shall be converted into a performance bond. |
|
9 |
Collect the tender documents |
Receive via paper document or electronic file |
|
10 |
On-site inspection |
The bidder shall be accompanied by personnel dispatched by the tendering party. Location: Within the premises of China National Heavy Duty Truck Group Liuzhou Yunli Special-Purpose Vehicle Co., Ltd. |
|
11 |
Deadline for Submission of Bidding Documents |
2025 August 27, Year 12:00 As of |
|
12 |
Place for Submission of Bidding Documents |
Office Building of China National Heavy Duty Truck Group Liuzhou Yunli Special-Purpose Vehicle Co., Ltd. 305 Party and Mass Work Department |
|
13 |
Number of Bid Document Copies and Other Requirements |
Number of bid document copies: Original 1 copy, duplicate 2 copy; once the bid is submitted, the bidding documents will not be returned. |
|
14 |
Bid Opening Time |
2025 August 28, Year 2:00 PM time |
|
15 |
Bidding opening method |
Sealed and Unordered Bid Opening |
|
16 |
Evaluation Committee Members |
Tendering Party |
2 1. Bidding Instructions条款
2.1 Party A: the tendering party, namely China National Heavy Duty Truck Group Liuzhou Yunli Special-Purpose Vehicle Co., Ltd.
Party B: Bidder
2.2 Bidding-related qualifications and bidding documents:
A copy of the business license, a power of attorney, copies of the identification cards of the legal representative and the authorized representative, a copy of the remittance slip for the bid bond, and other supporting documents demonstrating the bidder’s capabilities, among others. All the aforementioned documents shall be bound in the specified order.
2.3 The bidding entity shall have been established for more than three years (calculated from the date of issuance of its business license to the day of bid opening); the approved scope of business of the bidding entity shall meet the requirements of the option it has selected. Installation of Explosion-Proof Lighting in the Second Phase Paint Repair Booth at Liuzhou Transportation Capacity Pending projects.
2.4 The subject of this tender is: Installation of Explosion-Proof Lighting in the Second Phase Paint Repair Booth at Liuzhou Transportation Capacity Project 。
2.5 Bidding Price: Bids shall be submitted in accordance with the attachments to Chapter 8 (prices are quoted inclusive of tax).
3 , Expense Settlement
3.1 Payment Method: To be completed by the Contractor Installation of Explosion-Proof Lighting in the Second Phase Paint Repair Booth at Liuzhou Transportation Capacity Thereafter, the Contractor shall provide a special VAT invoice in compliance with national requirements and corresponding to the contract payment amount; payment shall be made within 30 days of posting such invoice, at 97% of the contract amount. The remaining 3% shall be held as a retention fund and paid upon expiration of the warranty period provided no quality issues are found.
3.2 The agreed method of payment for the project contract: six-month commercial bills of exchange (including bank-accepted bills and commercially accepted bills):
4 , Performance Bond
To ensure the performance of this Agreement, RMB 5,000 of the Bidder’s bid bond shall be converted into a performance bond. If the Bidder unilaterally terminates the Contract prior to its completion, the Tenderee shall not refund the Bidder’s performance bond. However, if the Services are rendered in full compliance with the Contract and upon the expiration of the Contract Term without any disputes between the Parties, Party A shall refund Party B’s performance bond within 5 to 20 business days.
5 , Quality Control
5.1 Party B shall perform the work in accordance with the scope of the winning bid and ultimately obtain acceptance by Party A. For the installation of equipment that is subject to inspection by the state or relevant industry authorities, Party B shall handle the requisite procedures in compliance with the applicable inspection requirements and ensure that such equipment passes the inspection.
5.2 Warranty Period: The warranty period for the installation of explosion-proof lights in the second-phase paint-repair workshop at Liuzhou Transportation Capacity is one year. 。
6 , Liability Protection
6.1 Party A’s Responsibilities:
(1) Provide the site required for construction.
(2) Upon the construction conditions being met, Party A shall notify Party B one day in advance to commence construction.
6.2 Party B’s Responsibilities:
(1) Party B shall be responsible for organizing construction in accordance with the scope of the winning bid and the schedule specified by Party A, and the work must ultimately pass Party A’s acceptance inspection.
(2) With respect to explosion-proof lighting services and accessories that are subject to inspection by the state or relevant industry authorities, if the performance of the materials provided by Party B or of any components replaced after repair fails to meet the requirements stipulated in such inspections, Party B shall be liable for breach of contract. In addition, Party B shall bear full responsibility for any economic losses incurred by Party A as a result thereof.
6.3 Upon entering Party A’s construction site, Party B’s personnel shall comply with Party A’s relevant management regulations, provide and use qualified safety equipment and personal protective equipment, ensure safe and civilized construction practices, and adhere to applicable occupational safety and health regulations. Any occupational safety accidents occurring during construction or any personal injury or property damage caused to third parties shall be the sole responsibility of Party B.
6.4 Bidders shall carefully review the tender documents, fully understand the name, purpose, quantity, quality, and delivery date of the tender project, and thoroughly comprehend the qualification requirements that bidders are required to meet.
6.5 Bidders shall not collude with one another in submitting bid prices, nor shall they engage in conduct that undermines fair competition among bidders and infringes upon the legitimate rights and interests of the procuring entity or other bidders. Bidders shall also not collude with the procuring entity in bidding, thereby harming the interests of the procuring entity or the legitimate rights and interests of others.
Chapter 3 Bid Opening
Party A shall conduct the public bid opening at the prescribed time and in the designated venue, and shall invite the legal representative (or head of the entity) of each Party B, or their duly authorized agent, to attend on time. Personnel representing the bidders at the bid-opening meeting shall be thoroughly familiar with the repair services and spare-parts prices submitted in their bids, so as to respond to any queries and provide clarifications during the evaluation process. Failure by a bidder to attend the bid-opening shall be deemed as acceptance of the bid-opening results.
Chapter Four Bid Evaluation
1 1. Party A shall organize relevant professionals to conduct the bid evaluation, which shall be conducted in accordance with the principles of fairness, impartiality, scientific rigor, and selection of the best proposal. The “Comprehensive Evaluation Method” shall be adopted, under which the members of the Bid Evaluation Committee shall comprehensively evaluate the tender documents and commitments submitted by each bidder. The winning bidder shall be determined in descending order of scores based on the preliminary evaluation results and the scoring criteria set forth in the Detailed Rules for Comprehensive Evaluation. No explanations will be provided to unsuccessful bidders. 。
2 1. If a tender document falls under any of the following circumstances, the Evaluation Committee shall treat it as non-responsive to the tender documents or as an invalid bid:
1 ) The sample does not comply with the requirements stipulated in the tender documents;
2 ) Where the tender document is not stamped by the bidder, or where it is not signed or stamped by the legal representative or by an authorized agent duly authorized by the legal representative;
3 ) Not sealed or completed in the prescribed format, with incomplete content or illegible key information that cannot be identified;
4 ) Where a bidder submits two or more quotation documents with differing contents, or includes two or more quotations for the same procurement item in a single quotation document without specifying which one is valid, except where alternative proposals are submitted in accordance with the provisions of the tender documents;
5 ) The bidder’s name or organizational structure is inconsistent with the qualification review;
6 ) The bidder fails to provide the bid bond as required by the tender documents;
7 ) Where the content of tender documents submitted by different bidders is abnormally consistent;
8 ) Where the tender documents of different bidders are intermingled;
9 ) Where different bidders entrust the same person to submit bids;
10 ) Where different bidders use the same individual’s or enterprise’s funds to pay the bid bond;
11 ) Failing to comply with the substantive requirements set forth in the tender documents, such as delivery schedules, quality standards, and warranty periods;
12) Providing false materials to obtain the bid;
13 ) Any other activities intended to compromise the fairness of the tender outcome.
Chapter 5 Contract Terms
1 The tenderer and the successful bidder shall, within three days from the date of issuance of the Notice of Award (subject to the specific requirements of the tenderer), enter into a written contract in accordance with the tender documents and the successful bidder’s tender submission; the construction period shall be calculated from the date on which the Notice of Award is issued. If the successful bidder, without just cause, refuses to sign the contract, imposes additional conditions upon signing, or fails to submit the performance bond as required by the tender documents, the tenderer shall have the right to disqualify the bidder, and the bid bond shall not be refunded. Furthermore, if the losses incurred by the tenderer exceed the amount of the bid bond, the successful bidder shall also be liable for compensating the excess.
2、 The successful bidder shall complete the awarded project in accordance with quality assurance requirements and shall not sub-contract or further sub-contract the project to any third party; otherwise, such conduct shall be deemed a breach of contract, and the tendering entity or relevant authorities shall have the right to terminate the contract.
3、 Installation of Explosion-Proof Lighting in the Second Phase Paint Repair Booth at Liuzhou Transportation Capacity Items included in the project list shall be settled in accordance with the list; for items not listed, Party B shall submit a quotation for the repair work, which, upon approval by Party A, shall serve as the basis for settlement at the approved price.
Chapter Six On-site inspection
During the bidding period, the bidder shall be accompanied by personnel dispatched by the tendering party for an on-site inspection at the premises of China National Heavy Duty Truck Group Liuzhou Yunli Special-Purpose Vehicle Co., Ltd.
Chapter 7 Preparation of Tender Documents
1、 The bidder’s tender document consists of three parts: qualification certification documents, the technical section of the tender document, and the commercial section of the tender document. 。
1.1 Qualification Certification Documents
1 ) Copy of business license;
2 ) Power of Attorney;
3 ) Photocopies of the legal person’s and the authorized representative’s identification cards;
4 ) A copy of the bank transfer slip for the bid bond.
2 , Technical Section
2.1 Construction Organization (Please indicate whether on-site personnel are stationed)
1 ) Measures to ensure maintenance efficiency;
2 ) Technical organizational measures to ensure the quality of repair work;
3 ) Technical and organizational measures to ensure safe operations;
4 ) Technical and organizational measures to ensure civilized construction;
2.2 Project Management Organization: The project team is fully staffed, with robust technical expertise across all disciplines.
2.3 Corporate Reputation and Strength: Recent three-year track record of similar projects.
3 , Business Section
3.1 Letter of Bid;
3.2 Bidding Price Summary Table;
3.3 Installation of Explosion-Proof Lighting in the Second Phase Paint Repair Booth at Liuzhou Transportation Capacity Project Quotation list;
3.4 Bidder’s Undertaking
Note: For forms provided in the tender documents, fill them out according to the specified format; for those not provided, bidders shall prepare their own forms, provided that they include the aforementioned content. ; The above three sections shall be bound into a single bidding document.
Chapter Eight Attachment
Explanation:
1 1. Bidders must carefully complete and submit the attached documents in this section.
2 1. Clear responses shall be provided to the requirements set forth in the attached document;
3 The signatory of the attached documents shall warrant that all responses to inquiries, all statements made, and all qualification and credential documents and materials submitted are true and accurate.
4 The tendering entity shall maintain the confidentiality of the documents and materials submitted by bidders; however, such materials will not be returned.
5 1. All attached documents shall be written in Chinese and shall form part of the bidding documents.
Note: Due to website character limits, please contact the designated contact person to obtain the attachment.
Official Account
Quick Navigation
Service Hotline:0772-3269371
Sales Hotline:0772-3269368
Business Inquiry:18507729998(Manager Zhang)
Address: No. 12, Leye Road, Xinxing Industrial Park, Liujiang District, Liuzhou City
Copyright © 2026 SINOTRUK Liuzhou Yunli Special Vehicle Co., LTD.